United for El Salvador Recovery plan from the damage caused by the earthquakes of January 13th and February 13th 2001

Inter-American Development Bank
Compartir:

Contenido

Message by His Excellency Francisco Flores, President of the Republic of El Salvador. Country background. Territory and population. Political development and democratic strenghthening. Decentralization and citizen participation. Social development. Economic policies. Impact of earthquakes. The natural phenomena. Emergency response actions. Damage estimates. Action plan recovery. Vision. Strategic guidelines. Objectives. Priorities. Phases of work. Needs and constraints. Action plans. Participatory Management of projects. Final remarks. ANNEX 1. Action plans by sectors. Infrastructure. Social sectors. Environment. Productive sectors. ANNEX II: Project profiles.

APA

Inter-American Development Bank. (2001). United for El Salvador Recovery plan from the damage caused by the earthquakes of January 13th and February 13th 2001 ([No definido] ed.). Inter-American Development Bank.

Detalles

  • Ubicación:Colección general - 551.227 284 - I58r
  • Edición:[No definido]
  • Ciudad:Madrid
  • Fecha Publicación2001
  • Editorial:Inter-American Development Bank
  • Temas:TERREMOTOS. DESASTRES NATURALES.
  • ISBN:[No definido]

Inventarios

Inventario Cooperante Estado
1 0009805 Asamblea Disponible
Copyright © 2004 - 2024 SIAB. Todos los derechos reservados.